[openstudio.measure.OSRunner] <1> Cannot find current Workflow Step
Run options: --seed 30457

# Running:

**MEASURE APPLICABILITY**
[openstudio.WorkflowStepResult] <0> WorkflowStepResult value called with undefined stepResult, returning 'Success'
0 = Success
**INITIAL CONDITION**
The model started with 34 materials, 25 constructions, and 7. The default construction set was '189.1-2009 - CZ5 - Office'.
**FINAL CONDITION**
The model ended with 40 materials, 41 constructions, and 14. The default construction set is now '189.1-2009 - CZ5 - Office with CLT'. Created new CLT constructions and assigned them to new construction sets.
**INFO MESSAGES**
Validating arguments...
All argument values are valid.
Duplicating existing construction sets to leave the original in place for comparison.
Creating or Modifying 189.1-2009 - CZ6 - Office with CLT
Creating material: CLT - SPF Floor
Updating CLT - SPF Floor with custom thickness 0.11
Creating material: CLT - SPF Roof
Updating CLT - SPF Roof with custom thickness 0.11
Creating material: CLT - SPF Wall
Updating CLT - SPF Wall with custom thickness 0.11
Added CLT layer CLT - SPF Wall to exterior wall construction
Creating material: Outer Polyiso Insulation 5.28 R-value
Calculated thickness 0.11 for material Outer Polyiso Insulation 5.28 R-value based on target R-value of 5.28
Updating Outer Polyiso Insulation 5.28 R-value with custom thickness 0.11
Added outer insulation layer Outer Polyiso Insulation 5.28 R-value to exterior wall construction
Creating material: Roof Insulation 5.28 R-value
Calculated thickness 0.11 for material Roof Insulation 5.28 R-value based on target R-value of 5.28
Updating Roof Insulation 5.28 R-value with custom thickness 0.11
Created roof construction Roof CLT and Insulation - R-6.32
Created exterior wall construction Exterior Wall CLT and Insulation - R-6.32
Creating material: Lightweight Concrete
Created inner floor construction Inner Floor CLT and Concrete
Using existing material: Lightweight Concrete
Created inner ceiling construction Inner Ceiling Concrete and CLT
Assigned inner floor and ceiling constructions to defaultInteriorSurfaceConstructions for '189.1-2009 - CZ6 - Office with CLT'
Assigned roof construction to defaultExteriorSurfaceConstructions for '189.1-2009 - CZ6 - Office with CLT'
Assigned exterior wall construction to defaultExteriorSurfaceConstructions for '189.1-2009 - CZ6 - Office with CLT'
Creating or Modifying 189.1-2009 - CZ1 - Office with CLT
Using existing material: CLT - SPF Floor
Using existing material: CLT - SPF Roof
Using existing material: CLT - SPF Wall
Added CLT layer CLT - SPF Wall to exterior wall construction
Using existing material: Outer Polyiso Insulation 5.28 R-value
Added outer insulation layer Outer Polyiso Insulation 5.28 R-value to exterior wall construction
Using existing material: Roof Insulation 5.28 R-value
Created roof construction Roof CLT and Insulation - R-6.32 1
Created exterior wall construction Exterior Wall CLT and Insulation - R-6.32 1
Assigned inner floor and ceiling constructions to defaultInteriorSurfaceConstructions for '189.1-2009 - CZ1 - Office with CLT'
Assigned roof construction to defaultExteriorSurfaceConstructions for '189.1-2009 - CZ1 - Office with CLT'
Assigned exterior wall construction to defaultExteriorSurfaceConstructions for '189.1-2009 - CZ1 - Office with CLT'
Creating or Modifying 189.1-2009 - CZ2 - Office with CLT
Using existing material: CLT - SPF Floor
Using existing material: CLT - SPF Roof
Using existing material: CLT - SPF Wall
Added CLT layer CLT - SPF Wall to exterior wall construction
Using existing material: Outer Polyiso Insulation 5.28 R-value
Added outer insulation layer Outer Polyiso Insulation 5.28 R-value to exterior wall construction
Using existing material: Roof Insulation 5.28 R-value
Created roof construction Roof CLT and Insulation - R-6.32 2
Created exterior wall construction Exterior Wall CLT and Insulation - R-6.32 2
Assigned inner floor and ceiling constructions to defaultInteriorSurfaceConstructions for '189.1-2009 - CZ2 - Office with CLT'
Assigned roof construction to defaultExteriorSurfaceConstructions for '189.1-2009 - CZ2 - Office with CLT'
Assigned exterior wall construction to defaultExteriorSurfaceConstructions for '189.1-2009 - CZ2 - Office with CLT'
Creating or Modifying 189.1-2009 - CZ3 - Office with CLT
Using existing material: CLT - SPF Floor
Using existing material: CLT - SPF Roof
Using existing material: CLT - SPF Wall
Added CLT layer CLT - SPF Wall to exterior wall construction
Using existing material: Outer Polyiso Insulation 5.28 R-value
Added outer insulation layer Outer Polyiso Insulation 5.28 R-value to exterior wall construction
Using existing material: Roof Insulation 5.28 R-value
Created roof construction Roof CLT and Insulation - R-6.32 3
Created exterior wall construction Exterior Wall CLT and Insulation - R-6.32 3
Assigned inner floor and ceiling constructions to defaultInteriorSurfaceConstructions for '189.1-2009 - CZ3 - Office with CLT'
Assigned roof construction to defaultExteriorSurfaceConstructions for '189.1-2009 - CZ3 - Office with CLT'
Assigned exterior wall construction to defaultExteriorSurfaceConstructions for '189.1-2009 - CZ3 - Office with CLT'
Creating or Modifying 189.1-2009 - CZ4 - Office with CLT
Using existing material: CLT - SPF Floor
Using existing material: CLT - SPF Roof
Using existing material: CLT - SPF Wall
Added CLT layer CLT - SPF Wall to exterior wall construction
Using existing material: Outer Polyiso Insulation 5.28 R-value
Added outer insulation layer Outer Polyiso Insulation 5.28 R-value to exterior wall construction
Using existing material: Roof Insulation 5.28 R-value
Created roof construction Roof CLT and Insulation - R-6.32 4
Created exterior wall construction Exterior Wall CLT and Insulation - R-6.32 4
Assigned inner floor and ceiling constructions to defaultInteriorSurfaceConstructions for '189.1-2009 - CZ4 - Office with CLT'
Assigned roof construction to defaultExteriorSurfaceConstructions for '189.1-2009 - CZ4 - Office with CLT'
Assigned exterior wall construction to defaultExteriorSurfaceConstructions for '189.1-2009 - CZ4 - Office with CLT'
Creating or Modifying 189.1-2009 - CZ5 - Office with CLT
Using existing material: CLT - SPF Floor
Using existing material: CLT - SPF Roof
Using existing material: CLT - SPF Wall
Added CLT layer CLT - SPF Wall to exterior wall construction
Using existing material: Outer Polyiso Insulation 5.28 R-value
Added outer insulation layer Outer Polyiso Insulation 5.28 R-value to exterior wall construction
Using existing material: Roof Insulation 5.28 R-value
Created roof construction Roof CLT and Insulation - R-6.32 5
Created exterior wall construction Exterior Wall CLT and Insulation - R-6.32 5
Assigned inner floor and ceiling constructions to defaultInteriorSurfaceConstructions for '189.1-2009 - CZ5 - Office with CLT'
Assigned roof construction to defaultExteriorSurfaceConstructions for '189.1-2009 - CZ5 - Office with CLT'
Assigned exterior wall construction to defaultExteriorSurfaceConstructions for '189.1-2009 - CZ5 - Office with CLT'
Updated Default Building Construction Set to use 189.1-2009 - CZ5 - Office with CLT
Creating or Modifying 189.1-2009 - CZ7-8 - Office with CLT
Using existing material: CLT - SPF Floor
Using existing material: CLT - SPF Roof
Using existing material: CLT - SPF Wall
Added CLT layer CLT - SPF Wall to exterior wall construction
Using existing material: Outer Polyiso Insulation 5.28 R-value
Added outer insulation layer Outer Polyiso Insulation 5.28 R-value to exterior wall construction
Using existing material: Roof Insulation 5.28 R-value
Created roof construction Roof CLT and Insulation - R-6.32 6
Created exterior wall construction Exterior Wall CLT and Insulation - R-6.32 6
Assigned inner floor and ceiling constructions to defaultInteriorSurfaceConstructions for '189.1-2009 - CZ7-8 - Office with CLT'
Assigned roof construction to defaultExteriorSurfaceConstructions for '189.1-2009 - CZ7-8 - Office with CLT'
Assigned exterior wall construction to defaultExteriorSurfaceConstructions for '189.1-2009 - CZ7-8 - Office with CLT'
**WARNING MESSAGES**
**ERROR MESSAGES**
***Machine-Readable Attributes**
[
{
   "name" : "exclude_construction_sets",
   "value" : ""
},{
   "name" : "duplicate_all_sets",
   "value" : true
},{
   "name" : "use_custom_inner_floor_thickness",
   "value" : false
},{
   "name" : "use_custom_roof_thickness",
   "value" : false
},{
   "name" : "replace_external_walls",
   "value" : true
},{
   "name" : "use_custom_wall_thickness",
   "value" : false
},{
   "name" : "infer_insulation_levels",
   "value" : false
},{
   "name" : "inner_floor_clt_type",
   "value" : "SPF"
},{
   "name" : "inner_floor_clt_ply",
   "value" : "3"
},{
   "name" : "inner_floor_clt_thickness",
   "value" : 0.1016
},{
   "name" : "roof_clt_type",
   "value" : "SPF"
},{
   "name" : "roof_clt_ply",
   "value" : "3"
},{
   "name" : "roof_clt_thickness",
   "value" : 0.17150000000000001
},{
   "name" : "roof_insulation_r_value",
   "value" : 5.2800000000000002
},{
   "name" : "facade_layer",
   "value" : "None"
},{
   "name" : "outer_insulation",
   "value" : "Polyiso"
},{
   "name" : "exterior_insulation_r_value",
   "value" : 5.2800000000000002
},{
   "name" : "clt_layer",
   "value" : "SPF"
},{
   "name" : "wall_clt_ply",
   "value" : "3"
},{
   "name" : "wall_clt_layer_thickness",
   "value" : 0.1016
},{
   "name" : "inner_insulation",
   "value" : "None"
},{
   "name" : "interior_insulation_r_value",
   "value" : 0.0
},{
   "name" : "inner_wall",
   "value" : "None"
}
]
***Files Generated**


[openstudio.WorkflowStepResult] <0> WorkflowStepResult value called with undefined stepResult, returning 'Success'
.

Finished in 1.621377s, 0.6168 runs/s, 5.5508 assertions/s.

1 runs, 9 assertions, 0 failures, 0 errors, 0 skips